• 1-802-489-0828
  • Monday to Friday - 8:00am to 5:00pm
  • 5780 Main St NE, Minneapolis, MN 55432, USA
UltraDT – UDT Polyurea Summer (3 Gallon Kit)
  • SKU: 001602

UltraDT – UDT Polyurea Summer (3 Gallon Kit)

$191.57
DESCRIPTION

Product Overview

UDT Polyurea is a high‑solids, concrete basecoat with rapid curing properties that enables fast chip-scraping and topcoating times. Developed as an alternative to traditional MC Epoxy coatings, UDT Polyurea provides contractors with the ability to complete projects quickly – think “1‑day garage floor” systems.

UDT Polyurea Summer is specifically formulated for warmer, humid environments. Pre‑pigmented in Mineral Gray and Medium Tan, it is designed to be used as a thin‑film, pigmented “body coat” for the UDT Chip‑Flake system, offering an excellent bond to concrete along with extended working time and fast dry times.

Why Choose UDT Polyurea?

  • Tenacious bond strength to concrete for superior adhesion
  • Extended working time and fast dry times, comparable to industry‑leading “1‑day garage floor” systems
  • Friendly “flow” and “feel” with excellent hide (opacity) and no settling
  • Versatile: can be used as a body coat, grout coat, or primer

Unique Advantages

  • Low odor & low viscosity
  • Quick dry times
  • Excellent opacity (hide)
  • Universal Part B for simplified inventory
  • Non‑hazardous / DOT & IATA (air) non‑regulated

Product Specifications

  • Kit Size: 3 Gallon Kit (1.5 gal Part A + 1.5 gal Part B)
  • Mix Ratio: 1:1 by volume
  • Application: Typically used as a thin‑film, pigmented body coat for Chip‑Flake systems
  • Dry Times: Rapid cure to expedite project turnaround

Application & Finish

Finished Floor Example:
UDT Polyurea Summer finished floor

Product Documentation

Additional Information

UDT Polyurea Summer is engineered to offer exceptional performance as a thin‑film, pigmented coating with rapid cure properties. Its formulation guarantees excellent opacity and a smooth finish without settling, making it ideal for fast‑turnaround projects. Ensure that the substrate is clean and properly prepared before application to achieve optimal results.

ADDITIONAL INFORMATION
REVIEWS

RELATED PRODUCTS

BACK TO TOP